• 1363 Citations
  • 19 h-Index
1993 …2020

Research output per year

If you made any changes in Pure these will be visible here soon.

Research Output

Filter
Paper
2015

Towards automated constructability checking: A case study of aligning design information with formwork decisions

Jiang, L., Leicht, R. M. & Messner, J. I., Jan 1 2015, p. 531-539. 9 p.

Research output: Contribution to conferencePaper

4 Scopus citations
2014

BIM-based processes and standardized information exchanges for multizone airflow analysis

Lee, S., DeGraw, J. W., Bahnfleth, W., Leicht, R. M. & Messner, J. I., Jan 1 2014, p. 129-136. 8 p.

Research output: Contribution to conferencePaper

2013

A review of critical success factors and performance metrics on construction projects

Esmaeili, B., Franz, B., Molenaar, K. R., Leicht, R. M. & Messner, J., Jan 1 2013, p. 574-583. 10 p.

Research output: Contribution to conferencePaper

1 Scopus citations
2011

Developing a building information modeling framework for future facility projects on the Pennsylvania State University Campus

Dubler, C. R., Kasprzak, C. M., Messner, J. I. & Gannon, E. J., Dec 1 2011, p. 2602-2610. 9 p.

Research output: Contribution to conferencePaper

Evaluating the role of healthcare facility information on health information technology initiatives from a patient safety perspective

Lucas, J., Bulbul, T., Anumba, C. J. & Messner, J., Sep 29 2011, p. 720-727. 8 p.

Research output: Contribution to conferencePaper

3 Scopus citations

The development of the virtual construction simulator 3: An interactive simulation environment for construction management education

Lee, S., Nikolic, D., Messner, J. I. & Anumba, C. J., Sep 29 2011, p. 454-461. 8 p.

Research output: Contribution to conferencePaper

8 Scopus citations
2003

Using immersive virtual environments to develop and visualize construction schedules for advanced nuclear power plants

Whisker, V. E., Baratta, A. J., Yerrapathruni, S., Messner, J. I., Shaw, T. S., Warren, M. E., Rotthoff, E. S., Winters, J. W., Clelland, J. A. & Johnson, F. T., Jan 1 2003.

Research output: Contribution to conferencePaper

32 Scopus citations
2002

A construction simulation model for production planning at the Pentagon Renovation Project

Messner, J. I. & Lynch, T., Jan 1 2002, p. 145-153. 9 p.

Research output: Contribution to conferencePaper

Cost and schedule reduction of nuclear power plant construction using 4D CAD and immersive display technologies

Messner, J. I., Yerrapathruni, S. C., Baratta, A. J. & Riley, D. R., Jan 1 2002, p. 136-144. 9 p.

Research output: Contribution to conferencePaper

9 Scopus citations