A production performance prediction and field development tool for coalbed methane reservoirs: A proxy modeling approach

Vaibhav Rajput, E. D.K. Basel, Turgay Ertekin

Research output: Chapter in Book/Report/Conference proceedingConference contribution

2 Citations (Scopus)

Abstract

Field-scale simulations for development optimization can be overly demanding in terms of their time and manpower requirements. Exploration of a full suite of different design scenarios and operational behavior of a given reservoir becomes impossible within a reasonable period of time. This paper develops a method that can be used to predict production performance of a given field and perform field development studies with nominal manpower and computational requirements. Artificial neural networks (ANN) are used for development of expert systems for prediction of instantaneous and cumulative gas and water production, as well as for reservoir property prediction. A commercial reservoir simulator is used for generation of database for training, validation and testing of these expert systems. Uncertainty in reservoir properties is taken into account by varying the reservoir parameters within an estimated range of values. The overall performance levels of expert systems are optimized by varying various network parameters, and monitoring the error values for testing datasets. Networks used for prediction of gas and water production profiles perform at error bounds less than 3% (forward networks), while those that are developed for prediction of reservoir characteristics at error levels of 15-19% (inverse networks). Forward networks were then used for optimization of field development. In this case, net present value (NPV) of a given field was placed as the parameter to be maximized during the search for optimum design specifications. Several case studies were carried out and analyzed. Improper field development strategies can result in huge losses for operating companies. Arriving at a proper well/drainage area selection and operational well specifications requires large operational time and excessive amount of simulation runs. With accurate results being obtained in fraction of seconds, this paper provides a simple and computationally-efficient technique that can be used to predict various production profiles and carry out effective field development studies.

Original languageEnglish (US)
Title of host publicationSociety of Petroleum Engineers Western North America and Rocky Mountain Joint Conference and Exhibition 2014
PublisherSociety of Petroleum Engineers
Pages1007-1021
Number of pages15
ISBN (Print)9781632665294
StatePublished - Jan 1 2014
EventSociety of Petroleum Engineers Western North America and Rocky Mountain Joint Conference and Exhibition 2014 - Denver, CO, United States
Duration: Apr 15 2014Apr 18 2014

Publication series

NameSociety of Petroleum Engineers Western North America and Rocky Mountain Joint Conference and Exhibition 2014
Volume2

Other

OtherSociety of Petroleum Engineers Western North America and Rocky Mountain Joint Conference and Exhibition 2014
CountryUnited States
CityDenver, CO
Period4/15/144/18/14

Fingerprint

coalbed methane
Expert systems
expert system
prediction
modeling
Gases
Specifications
Water
Testing
Drainage
Simulators
Neural networks
development strategy
gas
artificial neural network
simulation
simulator
Coal bed methane
Monitoring
drainage

All Science Journal Classification (ASJC) codes

  • Geochemistry and Petrology

Cite this

Rajput, V., Basel, E. D. K., & Ertekin, T. (2014). A production performance prediction and field development tool for coalbed methane reservoirs: A proxy modeling approach. In Society of Petroleum Engineers Western North America and Rocky Mountain Joint Conference and Exhibition 2014 (pp. 1007-1021). (Society of Petroleum Engineers Western North America and Rocky Mountain Joint Conference and Exhibition 2014; Vol. 2). Society of Petroleum Engineers.
Rajput, Vaibhav ; Basel, E. D.K. ; Ertekin, Turgay. / A production performance prediction and field development tool for coalbed methane reservoirs : A proxy modeling approach. Society of Petroleum Engineers Western North America and Rocky Mountain Joint Conference and Exhibition 2014. Society of Petroleum Engineers, 2014. pp. 1007-1021 (Society of Petroleum Engineers Western North America and Rocky Mountain Joint Conference and Exhibition 2014).
@inproceedings{ba2cddbe22014e5e80d19b290d1e5d0d,
title = "A production performance prediction and field development tool for coalbed methane reservoirs: A proxy modeling approach",
abstract = "Field-scale simulations for development optimization can be overly demanding in terms of their time and manpower requirements. Exploration of a full suite of different design scenarios and operational behavior of a given reservoir becomes impossible within a reasonable period of time. This paper develops a method that can be used to predict production performance of a given field and perform field development studies with nominal manpower and computational requirements. Artificial neural networks (ANN) are used for development of expert systems for prediction of instantaneous and cumulative gas and water production, as well as for reservoir property prediction. A commercial reservoir simulator is used for generation of database for training, validation and testing of these expert systems. Uncertainty in reservoir properties is taken into account by varying the reservoir parameters within an estimated range of values. The overall performance levels of expert systems are optimized by varying various network parameters, and monitoring the error values for testing datasets. Networks used for prediction of gas and water production profiles perform at error bounds less than 3{\%} (forward networks), while those that are developed for prediction of reservoir characteristics at error levels of 15-19{\%} (inverse networks). Forward networks were then used for optimization of field development. In this case, net present value (NPV) of a given field was placed as the parameter to be maximized during the search for optimum design specifications. Several case studies were carried out and analyzed. Improper field development strategies can result in huge losses for operating companies. Arriving at a proper well/drainage area selection and operational well specifications requires large operational time and excessive amount of simulation runs. With accurate results being obtained in fraction of seconds, this paper provides a simple and computationally-efficient technique that can be used to predict various production profiles and carry out effective field development studies.",
author = "Vaibhav Rajput and Basel, {E. D.K.} and Turgay Ertekin",
year = "2014",
month = "1",
day = "1",
language = "English (US)",
isbn = "9781632665294",
series = "Society of Petroleum Engineers Western North America and Rocky Mountain Joint Conference and Exhibition 2014",
publisher = "Society of Petroleum Engineers",
pages = "1007--1021",
booktitle = "Society of Petroleum Engineers Western North America and Rocky Mountain Joint Conference and Exhibition 2014",

}

Rajput, V, Basel, EDK & Ertekin, T 2014, A production performance prediction and field development tool for coalbed methane reservoirs: A proxy modeling approach. in Society of Petroleum Engineers Western North America and Rocky Mountain Joint Conference and Exhibition 2014. Society of Petroleum Engineers Western North America and Rocky Mountain Joint Conference and Exhibition 2014, vol. 2, Society of Petroleum Engineers, pp. 1007-1021, Society of Petroleum Engineers Western North America and Rocky Mountain Joint Conference and Exhibition 2014, Denver, CO, United States, 4/15/14.

A production performance prediction and field development tool for coalbed methane reservoirs : A proxy modeling approach. / Rajput, Vaibhav; Basel, E. D.K.; Ertekin, Turgay.

Society of Petroleum Engineers Western North America and Rocky Mountain Joint Conference and Exhibition 2014. Society of Petroleum Engineers, 2014. p. 1007-1021 (Society of Petroleum Engineers Western North America and Rocky Mountain Joint Conference and Exhibition 2014; Vol. 2).

Research output: Chapter in Book/Report/Conference proceedingConference contribution

TY - GEN

T1 - A production performance prediction and field development tool for coalbed methane reservoirs

T2 - A proxy modeling approach

AU - Rajput, Vaibhav

AU - Basel, E. D.K.

AU - Ertekin, Turgay

PY - 2014/1/1

Y1 - 2014/1/1

N2 - Field-scale simulations for development optimization can be overly demanding in terms of their time and manpower requirements. Exploration of a full suite of different design scenarios and operational behavior of a given reservoir becomes impossible within a reasonable period of time. This paper develops a method that can be used to predict production performance of a given field and perform field development studies with nominal manpower and computational requirements. Artificial neural networks (ANN) are used for development of expert systems for prediction of instantaneous and cumulative gas and water production, as well as for reservoir property prediction. A commercial reservoir simulator is used for generation of database for training, validation and testing of these expert systems. Uncertainty in reservoir properties is taken into account by varying the reservoir parameters within an estimated range of values. The overall performance levels of expert systems are optimized by varying various network parameters, and monitoring the error values for testing datasets. Networks used for prediction of gas and water production profiles perform at error bounds less than 3% (forward networks), while those that are developed for prediction of reservoir characteristics at error levels of 15-19% (inverse networks). Forward networks were then used for optimization of field development. In this case, net present value (NPV) of a given field was placed as the parameter to be maximized during the search for optimum design specifications. Several case studies were carried out and analyzed. Improper field development strategies can result in huge losses for operating companies. Arriving at a proper well/drainage area selection and operational well specifications requires large operational time and excessive amount of simulation runs. With accurate results being obtained in fraction of seconds, this paper provides a simple and computationally-efficient technique that can be used to predict various production profiles and carry out effective field development studies.

AB - Field-scale simulations for development optimization can be overly demanding in terms of their time and manpower requirements. Exploration of a full suite of different design scenarios and operational behavior of a given reservoir becomes impossible within a reasonable period of time. This paper develops a method that can be used to predict production performance of a given field and perform field development studies with nominal manpower and computational requirements. Artificial neural networks (ANN) are used for development of expert systems for prediction of instantaneous and cumulative gas and water production, as well as for reservoir property prediction. A commercial reservoir simulator is used for generation of database for training, validation and testing of these expert systems. Uncertainty in reservoir properties is taken into account by varying the reservoir parameters within an estimated range of values. The overall performance levels of expert systems are optimized by varying various network parameters, and monitoring the error values for testing datasets. Networks used for prediction of gas and water production profiles perform at error bounds less than 3% (forward networks), while those that are developed for prediction of reservoir characteristics at error levels of 15-19% (inverse networks). Forward networks were then used for optimization of field development. In this case, net present value (NPV) of a given field was placed as the parameter to be maximized during the search for optimum design specifications. Several case studies were carried out and analyzed. Improper field development strategies can result in huge losses for operating companies. Arriving at a proper well/drainage area selection and operational well specifications requires large operational time and excessive amount of simulation runs. With accurate results being obtained in fraction of seconds, this paper provides a simple and computationally-efficient technique that can be used to predict various production profiles and carry out effective field development studies.

UR - http://www.scopus.com/inward/record.url?scp=84907042206&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=84907042206&partnerID=8YFLogxK

M3 - Conference contribution

AN - SCOPUS:84907042206

SN - 9781632665294

T3 - Society of Petroleum Engineers Western North America and Rocky Mountain Joint Conference and Exhibition 2014

SP - 1007

EP - 1021

BT - Society of Petroleum Engineers Western North America and Rocky Mountain Joint Conference and Exhibition 2014

PB - Society of Petroleum Engineers

ER -

Rajput V, Basel EDK, Ertekin T. A production performance prediction and field development tool for coalbed methane reservoirs: A proxy modeling approach. In Society of Petroleum Engineers Western North America and Rocky Mountain Joint Conference and Exhibition 2014. Society of Petroleum Engineers. 2014. p. 1007-1021. (Society of Petroleum Engineers Western North America and Rocky Mountain Joint Conference and Exhibition 2014).