Buffering decisions under MRP environment

A review

C. H. Chu, J. C. Hayya

Research output: Contribution to journalArticle

17 Citations (Scopus)

Abstract

This paper reviews the buffering issues in materials requirements planning (MRP) systems, issues whose combined effects have not been adequately dealt with in the literature. Though some factors, such as part commonality and lot sizing, have been dealt with individually, their interactions, for example, have so far not been ascertained.

Original languageEnglish (US)
Pages (from-to)325-331
Number of pages7
JournalOmega
Volume16
Issue number4
DOIs
StatePublished - Jan 1 1988

Fingerprint

Factors
Material requirements planning
Lot sizing
Interaction
Commonality

All Science Journal Classification (ASJC) codes

  • Strategy and Management
  • Management Science and Operations Research
  • Information Systems and Management

Cite this

Chu, C. H. ; Hayya, J. C. / Buffering decisions under MRP environment : A review. In: Omega. 1988 ; Vol. 16, No. 4. pp. 325-331.
@article{c799c70479834f039c9e02ef6bd3ceae,
title = "Buffering decisions under MRP environment: A review",
abstract = "This paper reviews the buffering issues in materials requirements planning (MRP) systems, issues whose combined effects have not been adequately dealt with in the literature. Though some factors, such as part commonality and lot sizing, have been dealt with individually, their interactions, for example, have so far not been ascertained.",
author = "Chu, {C. H.} and Hayya, {J. C.}",
year = "1988",
month = "1",
day = "1",
doi = "10.1016/0305-0483(88)90069-2",
language = "English (US)",
volume = "16",
pages = "325--331",
journal = "Omega",
issn = "0305-0483",
publisher = "Elsevier BV",
number = "4",

}

Buffering decisions under MRP environment : A review. / Chu, C. H.; Hayya, J. C.

In: Omega, Vol. 16, No. 4, 01.01.1988, p. 325-331.

Research output: Contribution to journalArticle

TY - JOUR

T1 - Buffering decisions under MRP environment

T2 - A review

AU - Chu, C. H.

AU - Hayya, J. C.

PY - 1988/1/1

Y1 - 1988/1/1

N2 - This paper reviews the buffering issues in materials requirements planning (MRP) systems, issues whose combined effects have not been adequately dealt with in the literature. Though some factors, such as part commonality and lot sizing, have been dealt with individually, their interactions, for example, have so far not been ascertained.

AB - This paper reviews the buffering issues in materials requirements planning (MRP) systems, issues whose combined effects have not been adequately dealt with in the literature. Though some factors, such as part commonality and lot sizing, have been dealt with individually, their interactions, for example, have so far not been ascertained.

UR - http://www.scopus.com/inward/record.url?scp=40849135339&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=40849135339&partnerID=8YFLogxK

U2 - 10.1016/0305-0483(88)90069-2

DO - 10.1016/0305-0483(88)90069-2

M3 - Article

VL - 16

SP - 325

EP - 331

JO - Omega

JF - Omega

SN - 0305-0483

IS - 4

ER -