Coordination and production planning for mechanical, electrical and plumbing construction

David R. Riley, II

Research output: Chapter in Book/Report/Conference proceedingConference contribution

6 Citations (Scopus)

Abstract

Technical systems in buildings are typically designed independently by specialty engineers and contractors. Before construction begins, the dimensions and configurations of systems must be evaluated to ensure they will fit into spaces provided between structural and architectural building systems. This process is known as Mechanical, Electrical, and Plumbing Coordination. While the obvious benefit of coordination is that field conflicts are reduced during construction, this process is often not managed effectively. As a result, mistakes are made that result in field conflicts, or the coordination process drags on too long and delays the project with adverse effects on production. This paper discusses coordination as a critical part- of the construction process, the benefits of coordinating work before it is permitted to proceed, and effective techniques for performing coordination on building projects. Case studies of mechanically intensive building projects are provided to demonstrate the costs and benefits of coordination, the methods of effective coordination management, and the impact of avoidable interference problems on production and project costs. Key elements of a successful coordination process are identified based on case study results.

Original languageEnglish (US)
Title of host publicationProceedings of Construction Congress VI: Building Together for a Better Tomorrow in an Increasingly Complex World
Pages690-700
Number of pages11
Volume278
DOIs
StatePublished - 2000
EventConstruction Congress VI: Building Together for a Better Tomorrow in an Increasingly Complex World - Orlando, FL, United States
Duration: Feb 20 2000Feb 22 2000

Other

OtherConstruction Congress VI: Building Together for a Better Tomorrow in an Increasingly Complex World
CountryUnited States
CityOrlando, FL
Period2/20/002/22/00

Fingerprint

Plumbing
Planning
Contractors
Drag
Costs
Engineers

All Science Journal Classification (ASJC) codes

  • Civil and Structural Engineering
  • Building and Construction

Cite this

Riley, II, D. R. (2000). Coordination and production planning for mechanical, electrical and plumbing construction. In Proceedings of Construction Congress VI: Building Together for a Better Tomorrow in an Increasingly Complex World (Vol. 278, pp. 690-700) https://doi.org/10.1061/40475(278)74
Riley, II, David R. / Coordination and production planning for mechanical, electrical and plumbing construction. Proceedings of Construction Congress VI: Building Together for a Better Tomorrow in an Increasingly Complex World. Vol. 278 2000. pp. 690-700
@inproceedings{e1adc1d9584d4a2dacbe6a6583fc046b,
title = "Coordination and production planning for mechanical, electrical and plumbing construction",
abstract = "Technical systems in buildings are typically designed independently by specialty engineers and contractors. Before construction begins, the dimensions and configurations of systems must be evaluated to ensure they will fit into spaces provided between structural and architectural building systems. This process is known as Mechanical, Electrical, and Plumbing Coordination. While the obvious benefit of coordination is that field conflicts are reduced during construction, this process is often not managed effectively. As a result, mistakes are made that result in field conflicts, or the coordination process drags on too long and delays the project with adverse effects on production. This paper discusses coordination as a critical part- of the construction process, the benefits of coordinating work before it is permitted to proceed, and effective techniques for performing coordination on building projects. Case studies of mechanically intensive building projects are provided to demonstrate the costs and benefits of coordination, the methods of effective coordination management, and the impact of avoidable interference problems on production and project costs. Key elements of a successful coordination process are identified based on case study results.",
author = "{Riley, II}, {David R.}",
year = "2000",
doi = "10.1061/40475(278)74",
language = "English (US)",
isbn = "9780784404751",
volume = "278",
pages = "690--700",
booktitle = "Proceedings of Construction Congress VI: Building Together for a Better Tomorrow in an Increasingly Complex World",

}

Riley, II, DR 2000, Coordination and production planning for mechanical, electrical and plumbing construction. in Proceedings of Construction Congress VI: Building Together for a Better Tomorrow in an Increasingly Complex World. vol. 278, pp. 690-700, Construction Congress VI: Building Together for a Better Tomorrow in an Increasingly Complex World, Orlando, FL, United States, 2/20/00. https://doi.org/10.1061/40475(278)74

Coordination and production planning for mechanical, electrical and plumbing construction. / Riley, II, David R.

Proceedings of Construction Congress VI: Building Together for a Better Tomorrow in an Increasingly Complex World. Vol. 278 2000. p. 690-700.

Research output: Chapter in Book/Report/Conference proceedingConference contribution

TY - GEN

T1 - Coordination and production planning for mechanical, electrical and plumbing construction

AU - Riley, II, David R.

PY - 2000

Y1 - 2000

N2 - Technical systems in buildings are typically designed independently by specialty engineers and contractors. Before construction begins, the dimensions and configurations of systems must be evaluated to ensure they will fit into spaces provided between structural and architectural building systems. This process is known as Mechanical, Electrical, and Plumbing Coordination. While the obvious benefit of coordination is that field conflicts are reduced during construction, this process is often not managed effectively. As a result, mistakes are made that result in field conflicts, or the coordination process drags on too long and delays the project with adverse effects on production. This paper discusses coordination as a critical part- of the construction process, the benefits of coordinating work before it is permitted to proceed, and effective techniques for performing coordination on building projects. Case studies of mechanically intensive building projects are provided to demonstrate the costs and benefits of coordination, the methods of effective coordination management, and the impact of avoidable interference problems on production and project costs. Key elements of a successful coordination process are identified based on case study results.

AB - Technical systems in buildings are typically designed independently by specialty engineers and contractors. Before construction begins, the dimensions and configurations of systems must be evaluated to ensure they will fit into spaces provided between structural and architectural building systems. This process is known as Mechanical, Electrical, and Plumbing Coordination. While the obvious benefit of coordination is that field conflicts are reduced during construction, this process is often not managed effectively. As a result, mistakes are made that result in field conflicts, or the coordination process drags on too long and delays the project with adverse effects on production. This paper discusses coordination as a critical part- of the construction process, the benefits of coordinating work before it is permitted to proceed, and effective techniques for performing coordination on building projects. Case studies of mechanically intensive building projects are provided to demonstrate the costs and benefits of coordination, the methods of effective coordination management, and the impact of avoidable interference problems on production and project costs. Key elements of a successful coordination process are identified based on case study results.

UR - http://www.scopus.com/inward/record.url?scp=58849166136&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=58849166136&partnerID=8YFLogxK

U2 - 10.1061/40475(278)74

DO - 10.1061/40475(278)74

M3 - Conference contribution

AN - SCOPUS:58849166136

SN - 9780784404751

VL - 278

SP - 690

EP - 700

BT - Proceedings of Construction Congress VI: Building Together for a Better Tomorrow in an Increasingly Complex World

ER -

Riley, II DR. Coordination and production planning for mechanical, electrical and plumbing construction. In Proceedings of Construction Congress VI: Building Together for a Better Tomorrow in an Increasingly Complex World. Vol. 278. 2000. p. 690-700 https://doi.org/10.1061/40475(278)74