Criteria for project assignments in multiple-project environments

Peerasit Patanakul, Dragan Z. Milosevic, Timothy R. Anderson

Research output: Contribution to journalConference article

8 Citations (Scopus)

Abstract

Project assignment, assigning a project to a project manager, is one of the organization's most strategically important decisions since it is a determinant of the project performance and the organizational performance. Despite its importance, project assignment is not well studied in the literature and it is performed intuitively in practice. By using concepts of case study research, this study explores project assignment processes in their real-life contexts. Then, the project assignment criteria obtained from the case studies are validated by a panel of experts, following the concepts of the Delphi method. In this paper, some of the research results are presented. In particular, we propose an integrated set of project assignment criteria, including some already proposed in the literature, and others that are new. As part of the criteria, we place a special emphasis on an integrated set of project managers' competencies that is applicable to the current multiple-project environments. In future research, we will use the criteria to build a model for project assignments. The conceptual outline of the model is presented.

Original languageEnglish (US)
Article numberOSPRM05
Pages (from-to)4037-4046
Number of pages10
JournalProceedings of the Hawaii International Conference on System Sciences
Volume37
StatePublished - Dec 1 2004
EventProceedings of the Hawaii International Conference on System Sciences - Big Island, HI., United States
Duration: Jan 5 2004Jan 8 2004

Fingerprint

Managers

All Science Journal Classification (ASJC) codes

  • Computer Science(all)

Cite this

@article{e976955f7de746c3afc1e01a9d02ccf5,
title = "Criteria for project assignments in multiple-project environments",
abstract = "Project assignment, assigning a project to a project manager, is one of the organization's most strategically important decisions since it is a determinant of the project performance and the organizational performance. Despite its importance, project assignment is not well studied in the literature and it is performed intuitively in practice. By using concepts of case study research, this study explores project assignment processes in their real-life contexts. Then, the project assignment criteria obtained from the case studies are validated by a panel of experts, following the concepts of the Delphi method. In this paper, some of the research results are presented. In particular, we propose an integrated set of project assignment criteria, including some already proposed in the literature, and others that are new. As part of the criteria, we place a special emphasis on an integrated set of project managers' competencies that is applicable to the current multiple-project environments. In future research, we will use the criteria to build a model for project assignments. The conceptual outline of the model is presented.",
author = "Peerasit Patanakul and Milosevic, {Dragan Z.} and Anderson, {Timothy R.}",
year = "2004",
month = "12",
day = "1",
language = "English (US)",
volume = "37",
pages = "4037--4046",
journal = "Proceedings of the Hawaii International Conference on System Sciences",
issn = "1060-3425",

}

Criteria for project assignments in multiple-project environments. / Patanakul, Peerasit; Milosevic, Dragan Z.; Anderson, Timothy R.

In: Proceedings of the Hawaii International Conference on System Sciences, Vol. 37, OSPRM05, 01.12.2004, p. 4037-4046.

Research output: Contribution to journalConference article

TY - JOUR

T1 - Criteria for project assignments in multiple-project environments

AU - Patanakul, Peerasit

AU - Milosevic, Dragan Z.

AU - Anderson, Timothy R.

PY - 2004/12/1

Y1 - 2004/12/1

N2 - Project assignment, assigning a project to a project manager, is one of the organization's most strategically important decisions since it is a determinant of the project performance and the organizational performance. Despite its importance, project assignment is not well studied in the literature and it is performed intuitively in practice. By using concepts of case study research, this study explores project assignment processes in their real-life contexts. Then, the project assignment criteria obtained from the case studies are validated by a panel of experts, following the concepts of the Delphi method. In this paper, some of the research results are presented. In particular, we propose an integrated set of project assignment criteria, including some already proposed in the literature, and others that are new. As part of the criteria, we place a special emphasis on an integrated set of project managers' competencies that is applicable to the current multiple-project environments. In future research, we will use the criteria to build a model for project assignments. The conceptual outline of the model is presented.

AB - Project assignment, assigning a project to a project manager, is one of the organization's most strategically important decisions since it is a determinant of the project performance and the organizational performance. Despite its importance, project assignment is not well studied in the literature and it is performed intuitively in practice. By using concepts of case study research, this study explores project assignment processes in their real-life contexts. Then, the project assignment criteria obtained from the case studies are validated by a panel of experts, following the concepts of the Delphi method. In this paper, some of the research results are presented. In particular, we propose an integrated set of project assignment criteria, including some already proposed in the literature, and others that are new. As part of the criteria, we place a special emphasis on an integrated set of project managers' competencies that is applicable to the current multiple-project environments. In future research, we will use the criteria to build a model for project assignments. The conceptual outline of the model is presented.

UR - http://www.scopus.com/inward/record.url?scp=12344304437&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=12344304437&partnerID=8YFLogxK

M3 - Conference article

AN - SCOPUS:12344304437

VL - 37

SP - 4037

EP - 4046

JO - Proceedings of the Hawaii International Conference on System Sciences

JF - Proceedings of the Hawaii International Conference on System Sciences

SN - 1060-3425

M1 - OSPRM05

ER -