Design of Single-Product Campaign Batch Plants under Demand Uncertainty

Spas B. Petkov, Costas D. Maranas

Research output: Contribution to journalArticle

46 Citations (Scopus)

Abstract

A new method is introduced for optimally designing multiproduct batch plants under the single-product campaign (SPC) production mode. Uncertain future product demands are described with normal probability distributions, and more than one processing unit of equal size are allowed per stage. At the expense of imposing the normality assumption for product demand uncertainty and the SPC production mode, the original two-stage stochastic optimization problem is transformed into a deterministic mixed-integer nonlinear programming problem without relying on implicit or explicit discretization of the uncertain variables. This is accomplished through the explicit solution of the inner problem and the analytical integration overall product demand realizations. This problem representation and solution strategy result in savings of orders of magnitude over existing methods in computational requirements.

Original languageEnglish (US)
Pages (from-to)896-910
Number of pages15
JournalAIChE Journal
Volume44
Issue number4
StatePublished - Apr 1 1998

Fingerprint

Uncertainty
Normal Distribution
Nonlinear programming
Probability distributions
Processing

All Science Journal Classification (ASJC) codes

  • Biotechnology
  • Environmental Engineering
  • Chemical Engineering(all)

Cite this

@article{3bd804cdff8b48d386f870922ae1463b,
title = "Design of Single-Product Campaign Batch Plants under Demand Uncertainty",
abstract = "A new method is introduced for optimally designing multiproduct batch plants under the single-product campaign (SPC) production mode. Uncertain future product demands are described with normal probability distributions, and more than one processing unit of equal size are allowed per stage. At the expense of imposing the normality assumption for product demand uncertainty and the SPC production mode, the original two-stage stochastic optimization problem is transformed into a deterministic mixed-integer nonlinear programming problem without relying on implicit or explicit discretization of the uncertain variables. This is accomplished through the explicit solution of the inner problem and the analytical integration overall product demand realizations. This problem representation and solution strategy result in savings of orders of magnitude over existing methods in computational requirements.",
author = "Petkov, {Spas B.} and Maranas, {Costas D.}",
year = "1998",
month = "4",
day = "1",
language = "English (US)",
volume = "44",
pages = "896--910",
journal = "AICHE Journal",
issn = "0001-1541",
publisher = "American Institute of Chemical Engineers",
number = "4",

}

Design of Single-Product Campaign Batch Plants under Demand Uncertainty. / Petkov, Spas B.; Maranas, Costas D.

In: AIChE Journal, Vol. 44, No. 4, 01.04.1998, p. 896-910.

Research output: Contribution to journalArticle

TY - JOUR

T1 - Design of Single-Product Campaign Batch Plants under Demand Uncertainty

AU - Petkov, Spas B.

AU - Maranas, Costas D.

PY - 1998/4/1

Y1 - 1998/4/1

N2 - A new method is introduced for optimally designing multiproduct batch plants under the single-product campaign (SPC) production mode. Uncertain future product demands are described with normal probability distributions, and more than one processing unit of equal size are allowed per stage. At the expense of imposing the normality assumption for product demand uncertainty and the SPC production mode, the original two-stage stochastic optimization problem is transformed into a deterministic mixed-integer nonlinear programming problem without relying on implicit or explicit discretization of the uncertain variables. This is accomplished through the explicit solution of the inner problem and the analytical integration overall product demand realizations. This problem representation and solution strategy result in savings of orders of magnitude over existing methods in computational requirements.

AB - A new method is introduced for optimally designing multiproduct batch plants under the single-product campaign (SPC) production mode. Uncertain future product demands are described with normal probability distributions, and more than one processing unit of equal size are allowed per stage. At the expense of imposing the normality assumption for product demand uncertainty and the SPC production mode, the original two-stage stochastic optimization problem is transformed into a deterministic mixed-integer nonlinear programming problem without relying on implicit or explicit discretization of the uncertain variables. This is accomplished through the explicit solution of the inner problem and the analytical integration overall product demand realizations. This problem representation and solution strategy result in savings of orders of magnitude over existing methods in computational requirements.

UR - http://www.scopus.com/inward/record.url?scp=0032050248&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=0032050248&partnerID=8YFLogxK

M3 - Article

VL - 44

SP - 896

EP - 910

JO - AICHE Journal

JF - AICHE Journal

SN - 0001-1541

IS - 4

ER -