Feasibility and operating costs of an air cycle for CCHP in a fast food restaurant

Horacio Perez-Blanco, Edward Vineyard

    Research output: Contribution to journalArticle

    1 Citation (Scopus)

    Abstract

    This work considers the possibilities of an air-based Brayton cycle to provide the power, heating and cooling needs of fast-food restaurants. A model of the cycle based on conventional turbomachinery loss coefficients is formulated. The heating, cooling and power capabilities of the cycle are extracted from simulation results. Power and thermal loads for restaurants in Knoxville, TN and in International Falls, MN, are considered. It is found that the cycle can meet the loads by setting speed and mass flow-rate apportionment between the power and cooling functional sections. The associated energy costs appear elevated when compared to the cost of operating individual components or a more conventional, absorption-based CHP system. A first-order estimate of capital investments is provided. Suggestions for future work whereby the operational costs could be reduced are given in the conclusions.

    Original languageEnglish (US)
    Pages (from-to)818-828
    Number of pages11
    JournalApplied Thermal Engineering
    Volume104
    DOIs
    StatePublished - Jul 5 2016

    Fingerprint

    Operating costs
    Cooling
    Air
    Brayton cycle
    Heating
    Costs
    Turbomachinery
    Thermal load
    Flow rate

    All Science Journal Classification (ASJC) codes

    • Energy Engineering and Power Technology
    • Industrial and Manufacturing Engineering

    Cite this

    Perez-Blanco, Horacio ; Vineyard, Edward. / Feasibility and operating costs of an air cycle for CCHP in a fast food restaurant. In: Applied Thermal Engineering. 2016 ; Vol. 104. pp. 818-828.
    @article{181f5303ce27495db229a80428f4e82f,
    title = "Feasibility and operating costs of an air cycle for CCHP in a fast food restaurant",
    abstract = "This work considers the possibilities of an air-based Brayton cycle to provide the power, heating and cooling needs of fast-food restaurants. A model of the cycle based on conventional turbomachinery loss coefficients is formulated. The heating, cooling and power capabilities of the cycle are extracted from simulation results. Power and thermal loads for restaurants in Knoxville, TN and in International Falls, MN, are considered. It is found that the cycle can meet the loads by setting speed and mass flow-rate apportionment between the power and cooling functional sections. The associated energy costs appear elevated when compared to the cost of operating individual components or a more conventional, absorption-based CHP system. A first-order estimate of capital investments is provided. Suggestions for future work whereby the operational costs could be reduced are given in the conclusions.",
    author = "Horacio Perez-Blanco and Edward Vineyard",
    year = "2016",
    month = "7",
    day = "5",
    doi = "10.1016/j.applthermaleng.2016.05.030",
    language = "English (US)",
    volume = "104",
    pages = "818--828",
    journal = "Applied Thermal Engineering",
    issn = "1359-4311",
    publisher = "Elsevier Limited",

    }

    Feasibility and operating costs of an air cycle for CCHP in a fast food restaurant. / Perez-Blanco, Horacio; Vineyard, Edward.

    In: Applied Thermal Engineering, Vol. 104, 05.07.2016, p. 818-828.

    Research output: Contribution to journalArticle

    TY - JOUR

    T1 - Feasibility and operating costs of an air cycle for CCHP in a fast food restaurant

    AU - Perez-Blanco, Horacio

    AU - Vineyard, Edward

    PY - 2016/7/5

    Y1 - 2016/7/5

    N2 - This work considers the possibilities of an air-based Brayton cycle to provide the power, heating and cooling needs of fast-food restaurants. A model of the cycle based on conventional turbomachinery loss coefficients is formulated. The heating, cooling and power capabilities of the cycle are extracted from simulation results. Power and thermal loads for restaurants in Knoxville, TN and in International Falls, MN, are considered. It is found that the cycle can meet the loads by setting speed and mass flow-rate apportionment between the power and cooling functional sections. The associated energy costs appear elevated when compared to the cost of operating individual components or a more conventional, absorption-based CHP system. A first-order estimate of capital investments is provided. Suggestions for future work whereby the operational costs could be reduced are given in the conclusions.

    AB - This work considers the possibilities of an air-based Brayton cycle to provide the power, heating and cooling needs of fast-food restaurants. A model of the cycle based on conventional turbomachinery loss coefficients is formulated. The heating, cooling and power capabilities of the cycle are extracted from simulation results. Power and thermal loads for restaurants in Knoxville, TN and in International Falls, MN, are considered. It is found that the cycle can meet the loads by setting speed and mass flow-rate apportionment between the power and cooling functional sections. The associated energy costs appear elevated when compared to the cost of operating individual components or a more conventional, absorption-based CHP system. A first-order estimate of capital investments is provided. Suggestions for future work whereby the operational costs could be reduced are given in the conclusions.

    UR - http://www.scopus.com/inward/record.url?scp=84974602373&partnerID=8YFLogxK

    UR - http://www.scopus.com/inward/citedby.url?scp=84974602373&partnerID=8YFLogxK

    U2 - 10.1016/j.applthermaleng.2016.05.030

    DO - 10.1016/j.applthermaleng.2016.05.030

    M3 - Article

    VL - 104

    SP - 818

    EP - 828

    JO - Applied Thermal Engineering

    JF - Applied Thermal Engineering

    SN - 1359-4311

    ER -