Impact of forecast horizon on replanning frequencies for a rolling horizon master production schedule

Research output: Chapter in Book/Report/Conference proceedingConference contribution

Abstract

This study extends previous research on rolling schedules and examines the impact of forecast window interval on replanning frequencies and master production schedule (MPS) performance in a rolling horizon setting. A paint company provided the referent system for this study and the MPS model developed in this paper assumes a deterministic demand environment. Preliminary results indicate that for a three-month forecast window, a two-month replanning frequency provided superior MPS performance in terms of total cost when compared to the other replanning intervals.

Original languageEnglish (US)
Title of host publicationProceedings - Annual Meeting of the Decision Sciences Institute
Editors Anon
PublisherDecis Sci Inst
Pages1236-1238
Number of pages3
Volume3
StatePublished - 1998
EventProceedings of the 1997 Annual Meeting of the Decision Sciences Institute. Part 1 (of 3) - San Diego, CA, USA
Duration: Nov 22 1997Nov 25 1997

Other

OtherProceedings of the 1997 Annual Meeting of the Decision Sciences Institute. Part 1 (of 3)
CitySan Diego, CA, USA
Period11/22/9711/25/97

Fingerprint

Paint
Rolling horizon
Forecast horizon
Schedule
Costs
Industry

All Science Journal Classification (ASJC) codes

  • Management Information Systems
  • Hardware and Architecture

Cite this

Venkataraman, R. R., & Nathan, J. (1998). Impact of forecast horizon on replanning frequencies for a rolling horizon master production schedule. In Anon (Ed.), Proceedings - Annual Meeting of the Decision Sciences Institute (Vol. 3, pp. 1236-1238). Decis Sci Inst.
Venkataraman, Ray R. ; Nathan, Jay. / Impact of forecast horizon on replanning frequencies for a rolling horizon master production schedule. Proceedings - Annual Meeting of the Decision Sciences Institute. editor / Anon. Vol. 3 Decis Sci Inst, 1998. pp. 1236-1238
@inproceedings{d826e9716c6246439fef7c994b03448a,
title = "Impact of forecast horizon on replanning frequencies for a rolling horizon master production schedule",
abstract = "This study extends previous research on rolling schedules and examines the impact of forecast window interval on replanning frequencies and master production schedule (MPS) performance in a rolling horizon setting. A paint company provided the referent system for this study and the MPS model developed in this paper assumes a deterministic demand environment. Preliminary results indicate that for a three-month forecast window, a two-month replanning frequency provided superior MPS performance in terms of total cost when compared to the other replanning intervals.",
author = "Venkataraman, {Ray R.} and Jay Nathan",
year = "1998",
language = "English (US)",
volume = "3",
pages = "1236--1238",
editor = "Anon",
booktitle = "Proceedings - Annual Meeting of the Decision Sciences Institute",
publisher = "Decis Sci Inst",

}

Venkataraman, RR & Nathan, J 1998, Impact of forecast horizon on replanning frequencies for a rolling horizon master production schedule. in Anon (ed.), Proceedings - Annual Meeting of the Decision Sciences Institute. vol. 3, Decis Sci Inst, pp. 1236-1238, Proceedings of the 1997 Annual Meeting of the Decision Sciences Institute. Part 1 (of 3), San Diego, CA, USA, 11/22/97.

Impact of forecast horizon on replanning frequencies for a rolling horizon master production schedule. / Venkataraman, Ray R.; Nathan, Jay.

Proceedings - Annual Meeting of the Decision Sciences Institute. ed. / Anon. Vol. 3 Decis Sci Inst, 1998. p. 1236-1238.

Research output: Chapter in Book/Report/Conference proceedingConference contribution

TY - GEN

T1 - Impact of forecast horizon on replanning frequencies for a rolling horizon master production schedule

AU - Venkataraman, Ray R.

AU - Nathan, Jay

PY - 1998

Y1 - 1998

N2 - This study extends previous research on rolling schedules and examines the impact of forecast window interval on replanning frequencies and master production schedule (MPS) performance in a rolling horizon setting. A paint company provided the referent system for this study and the MPS model developed in this paper assumes a deterministic demand environment. Preliminary results indicate that for a three-month forecast window, a two-month replanning frequency provided superior MPS performance in terms of total cost when compared to the other replanning intervals.

AB - This study extends previous research on rolling schedules and examines the impact of forecast window interval on replanning frequencies and master production schedule (MPS) performance in a rolling horizon setting. A paint company provided the referent system for this study and the MPS model developed in this paper assumes a deterministic demand environment. Preliminary results indicate that for a three-month forecast window, a two-month replanning frequency provided superior MPS performance in terms of total cost when compared to the other replanning intervals.

UR - http://www.scopus.com/inward/record.url?scp=0031620839&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=0031620839&partnerID=8YFLogxK

M3 - Conference contribution

AN - SCOPUS:0031620839

VL - 3

SP - 1236

EP - 1238

BT - Proceedings - Annual Meeting of the Decision Sciences Institute

A2 - Anon, null

PB - Decis Sci Inst

ER -

Venkataraman RR, Nathan J. Impact of forecast horizon on replanning frequencies for a rolling horizon master production schedule. In Anon, editor, Proceedings - Annual Meeting of the Decision Sciences Institute. Vol. 3. Decis Sci Inst. 1998. p. 1236-1238