Key attributes of a longitudinal study of green project delivery

Sinem Korkmaz, Michael Horman, David R. Riley, II

Research output: Chapter in Book/Report/Conference proceedingConference contribution

10 Citations (Scopus)

Abstract

If green buildings are to continue to reduce the environmental impact of buildings and improve the operating performance of facilities, it is now more important than ever that a study of key project delivery practices, like teaming strategies, contracting approaches, and incentives, be established for these projects. When the performance outcomes of these projects, like sustainable rating, final cost, project schedule and operating performance, are statistically correlated to the project delivery practices, tremendous insight is gained for owners on how to establish their team so that their performance objectives are maximized on their green project. Initial exploratory research reported in this paper confirms how scientifically challenging such a study is to pursue with rigor. There are so many potential variables that may impact sustainable performance outcomes that a quality study needs a sample size in the thousands. By necessity a large study must occur over many years and thus the design of the study is crucial due to the time that lapses between implementation and results. This type of study, often referenced as a longitudinal study, is common in more mature disciplines of anthropology and medicine, especially, epidemiology. The contributions of the paper include a set of preliminary project delivery attributes to focus on for green building projects and data collection and analysis methods for large study of green building project delivery. Copyright ASCE 2009.

Original languageEnglish (US)
Title of host publicationBuilding a Sustainable Future - Proceedings of the 2009 Construction Research Congress
Pages558-567
Number of pages10
DOIs
StatePublished - 2009
Event2009 Construction Research Congress - Building a Sustainable Future - Seattle, WA, United States
Duration: Apr 5 2009Apr 7 2009

Other

Other2009 Construction Research Congress - Building a Sustainable Future
CountryUnited States
CitySeattle, WA
Period4/5/094/7/09

Fingerprint

Epidemiology
Medicine
Environmental impact
Costs

All Science Journal Classification (ASJC) codes

  • Civil and Structural Engineering
  • Building and Construction

Cite this

Korkmaz, S., Horman, M., & Riley, II, D. R. (2009). Key attributes of a longitudinal study of green project delivery. In Building a Sustainable Future - Proceedings of the 2009 Construction Research Congress (pp. 558-567) https://doi.org/10.1061/41020(339)57
Korkmaz, Sinem ; Horman, Michael ; Riley, II, David R. / Key attributes of a longitudinal study of green project delivery. Building a Sustainable Future - Proceedings of the 2009 Construction Research Congress. 2009. pp. 558-567
@inproceedings{c24e5093934b4a5eb9e7c7a5b2cd4d06,
title = "Key attributes of a longitudinal study of green project delivery",
abstract = "If green buildings are to continue to reduce the environmental impact of buildings and improve the operating performance of facilities, it is now more important than ever that a study of key project delivery practices, like teaming strategies, contracting approaches, and incentives, be established for these projects. When the performance outcomes of these projects, like sustainable rating, final cost, project schedule and operating performance, are statistically correlated to the project delivery practices, tremendous insight is gained for owners on how to establish their team so that their performance objectives are maximized on their green project. Initial exploratory research reported in this paper confirms how scientifically challenging such a study is to pursue with rigor. There are so many potential variables that may impact sustainable performance outcomes that a quality study needs a sample size in the thousands. By necessity a large study must occur over many years and thus the design of the study is crucial due to the time that lapses between implementation and results. This type of study, often referenced as a longitudinal study, is common in more mature disciplines of anthropology and medicine, especially, epidemiology. The contributions of the paper include a set of preliminary project delivery attributes to focus on for green building projects and data collection and analysis methods for large study of green building project delivery. Copyright ASCE 2009.",
author = "Sinem Korkmaz and Michael Horman and {Riley, II}, {David R.}",
year = "2009",
doi = "10.1061/41020(339)57",
language = "English (US)",
isbn = "9780784410202",
pages = "558--567",
booktitle = "Building a Sustainable Future - Proceedings of the 2009 Construction Research Congress",

}

Korkmaz, S, Horman, M & Riley, II, DR 2009, Key attributes of a longitudinal study of green project delivery. in Building a Sustainable Future - Proceedings of the 2009 Construction Research Congress. pp. 558-567, 2009 Construction Research Congress - Building a Sustainable Future, Seattle, WA, United States, 4/5/09. https://doi.org/10.1061/41020(339)57

Key attributes of a longitudinal study of green project delivery. / Korkmaz, Sinem; Horman, Michael; Riley, II, David R.

Building a Sustainable Future - Proceedings of the 2009 Construction Research Congress. 2009. p. 558-567.

Research output: Chapter in Book/Report/Conference proceedingConference contribution

TY - GEN

T1 - Key attributes of a longitudinal study of green project delivery

AU - Korkmaz, Sinem

AU - Horman, Michael

AU - Riley, II, David R.

PY - 2009

Y1 - 2009

N2 - If green buildings are to continue to reduce the environmental impact of buildings and improve the operating performance of facilities, it is now more important than ever that a study of key project delivery practices, like teaming strategies, contracting approaches, and incentives, be established for these projects. When the performance outcomes of these projects, like sustainable rating, final cost, project schedule and operating performance, are statistically correlated to the project delivery practices, tremendous insight is gained for owners on how to establish their team so that their performance objectives are maximized on their green project. Initial exploratory research reported in this paper confirms how scientifically challenging such a study is to pursue with rigor. There are so many potential variables that may impact sustainable performance outcomes that a quality study needs a sample size in the thousands. By necessity a large study must occur over many years and thus the design of the study is crucial due to the time that lapses between implementation and results. This type of study, often referenced as a longitudinal study, is common in more mature disciplines of anthropology and medicine, especially, epidemiology. The contributions of the paper include a set of preliminary project delivery attributes to focus on for green building projects and data collection and analysis methods for large study of green building project delivery. Copyright ASCE 2009.

AB - If green buildings are to continue to reduce the environmental impact of buildings and improve the operating performance of facilities, it is now more important than ever that a study of key project delivery practices, like teaming strategies, contracting approaches, and incentives, be established for these projects. When the performance outcomes of these projects, like sustainable rating, final cost, project schedule and operating performance, are statistically correlated to the project delivery practices, tremendous insight is gained for owners on how to establish their team so that their performance objectives are maximized on their green project. Initial exploratory research reported in this paper confirms how scientifically challenging such a study is to pursue with rigor. There are so many potential variables that may impact sustainable performance outcomes that a quality study needs a sample size in the thousands. By necessity a large study must occur over many years and thus the design of the study is crucial due to the time that lapses between implementation and results. This type of study, often referenced as a longitudinal study, is common in more mature disciplines of anthropology and medicine, especially, epidemiology. The contributions of the paper include a set of preliminary project delivery attributes to focus on for green building projects and data collection and analysis methods for large study of green building project delivery. Copyright ASCE 2009.

UR - http://www.scopus.com/inward/record.url?scp=69949093067&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=69949093067&partnerID=8YFLogxK

U2 - 10.1061/41020(339)57

DO - 10.1061/41020(339)57

M3 - Conference contribution

SN - 9780784410202

SP - 558

EP - 567

BT - Building a Sustainable Future - Proceedings of the 2009 Construction Research Congress

ER -

Korkmaz S, Horman M, Riley, II DR. Key attributes of a longitudinal study of green project delivery. In Building a Sustainable Future - Proceedings of the 2009 Construction Research Congress. 2009. p. 558-567 https://doi.org/10.1061/41020(339)57