Real option theory has been extensively applied to natural resource extraction modeling and risk management, which proves to be a significantly more powerful method than the traditional ones such as discounted cash flows. This research attempts to extend a proposed real option model based on optimized price threshold strategy for gold mining operations. Besides exploring the risk from commodity price, the research also examines the effects of a declining stochastic production costs, due to technology innovation in the long term. The extended real option model further examines how the time to build a gold mine can impact the optimized price threshold strategy. Sensitivity analysis and numerical evidence show that, (1) innovation in mining technology will boost the mine’s profitability and also shift the optimized price threshold; (2) mining operators can hedge a significant level of risk by treating time to build properly. Further discussions are provided on mining investment strategy and policy implication for resource extraction.

Original languageEnglish (US)
Pages (from-to)2521-2544
Number of pages24
JournalEnvironment, Development and Sustainability
Volume20
Issue number6
DOIs
StatePublished - Dec 1 2018

Fingerprint

commodity price
production costs
production cost
commodity
resource
gold
economics
resources
innovation
gold mine
profitability
risk management
sensitivity analysis
natural resources
natural resource
time
Commodity prices
Time to build
Production cost
Resource economics

All Science Journal Classification (ASJC) codes

  • Geography, Planning and Development
  • Economics and Econometrics
  • Management, Monitoring, Policy and Law

Cite this

Zhang, Kuangyuan ; Olawoyin, Richard ; Nieto, Antonio ; Kleit, Andrew Nathan. / Risk of commodity price, production cost and time to build in resource economics. In: Environment, Development and Sustainability. 2018 ; Vol. 20, No. 6. pp. 2521-2544.
@article{95c16d83815e41f69ccfae4db3d6c801,
title = "Risk of commodity price, production cost and time to build in resource economics",
abstract = "Real option theory has been extensively applied to natural resource extraction modeling and risk management, which proves to be a significantly more powerful method than the traditional ones such as discounted cash flows. This research attempts to extend a proposed real option model based on optimized price threshold strategy for gold mining operations. Besides exploring the risk from commodity price, the research also examines the effects of a declining stochastic production costs, due to technology innovation in the long term. The extended real option model further examines how the time to build a gold mine can impact the optimized price threshold strategy. Sensitivity analysis and numerical evidence show that, (1) innovation in mining technology will boost the mine’s profitability and also shift the optimized price threshold; (2) mining operators can hedge a significant level of risk by treating time to build properly. Further discussions are provided on mining investment strategy and policy implication for resource extraction.",
author = "Kuangyuan Zhang and Richard Olawoyin and Antonio Nieto and Kleit, {Andrew Nathan}",
year = "2018",
month = "12",
day = "1",
doi = "10.1007/s10668-017-0003-0",
language = "English (US)",
volume = "20",
pages = "2521--2544",
journal = "Environment, Development and Sustainability",
issn = "1387-585X",
publisher = "Springer Netherlands",
number = "6",

}

Risk of commodity price, production cost and time to build in resource economics. / Zhang, Kuangyuan; Olawoyin, Richard; Nieto, Antonio; Kleit, Andrew Nathan.

In: Environment, Development and Sustainability, Vol. 20, No. 6, 01.12.2018, p. 2521-2544.

Research output: Contribution to journalArticle

TY - JOUR

T1 - Risk of commodity price, production cost and time to build in resource economics

AU - Zhang, Kuangyuan

AU - Olawoyin, Richard

AU - Nieto, Antonio

AU - Kleit, Andrew Nathan

PY - 2018/12/1

Y1 - 2018/12/1

N2 - Real option theory has been extensively applied to natural resource extraction modeling and risk management, which proves to be a significantly more powerful method than the traditional ones such as discounted cash flows. This research attempts to extend a proposed real option model based on optimized price threshold strategy for gold mining operations. Besides exploring the risk from commodity price, the research also examines the effects of a declining stochastic production costs, due to technology innovation in the long term. The extended real option model further examines how the time to build a gold mine can impact the optimized price threshold strategy. Sensitivity analysis and numerical evidence show that, (1) innovation in mining technology will boost the mine’s profitability and also shift the optimized price threshold; (2) mining operators can hedge a significant level of risk by treating time to build properly. Further discussions are provided on mining investment strategy and policy implication for resource extraction.

AB - Real option theory has been extensively applied to natural resource extraction modeling and risk management, which proves to be a significantly more powerful method than the traditional ones such as discounted cash flows. This research attempts to extend a proposed real option model based on optimized price threshold strategy for gold mining operations. Besides exploring the risk from commodity price, the research also examines the effects of a declining stochastic production costs, due to technology innovation in the long term. The extended real option model further examines how the time to build a gold mine can impact the optimized price threshold strategy. Sensitivity analysis and numerical evidence show that, (1) innovation in mining technology will boost the mine’s profitability and also shift the optimized price threshold; (2) mining operators can hedge a significant level of risk by treating time to build properly. Further discussions are provided on mining investment strategy and policy implication for resource extraction.

UR - http://www.scopus.com/inward/record.url?scp=85021702820&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=85021702820&partnerID=8YFLogxK

U2 - 10.1007/s10668-017-0003-0

DO - 10.1007/s10668-017-0003-0

M3 - Article

AN - SCOPUS:85021702820

VL - 20

SP - 2521

EP - 2544

JO - Environment, Development and Sustainability

JF - Environment, Development and Sustainability

SN - 1387-585X

IS - 6

ER -