SCenarios for cyber-physical systems integration in construction

Abiola Akanmu, Chimay Anumba, John Messner

Research output: Contribution to journalArticle

16 Citations (Scopus)

Abstract

There is an increasing growth in the use of virtual models in the construction industry but this use is often limited to the design and tendering/bidding stage. Much more benefit can be derived from these models by extending their use to the construction and operations and maintenance phases of a facility's lifecycle. A good way of achieving this involves real-time bi-directional coordination between virtual models and the physical construction. This will enable improvements in progress monitoring, construction process control, as-built documentation and sustainable building practices. To maintain bi-directional coordination, computational resources are required to tightly integrate the virtual models and the physical construction such that changes in one environment are automatically reflected in the other. This paper focuses on describing the role of bi-directional coordination in improving the construction project delivery process. A system architecture is presented, which illustrates the necessary technologies and sub-systems needed to facilitate the two way coordination. Future deployment scenarios are also presented to illustrate the potential benefits to the construction industry.

Original languageEnglish (US)
Pages (from-to)240-260
Number of pages21
JournalJournal of Information Technology in Construction
Volume18
StatePublished - Jun 1 2013

Fingerprint

Construction industry
Process control
Cyber Physical System
Monitoring

All Science Journal Classification (ASJC) codes

  • Civil and Structural Engineering
  • Building and Construction
  • Computer Science Applications

Cite this

@article{6aeef3ff6a54461688f33c3cb80363dd,
title = "SCenarios for cyber-physical systems integration in construction",
abstract = "There is an increasing growth in the use of virtual models in the construction industry but this use is often limited to the design and tendering/bidding stage. Much more benefit can be derived from these models by extending their use to the construction and operations and maintenance phases of a facility's lifecycle. A good way of achieving this involves real-time bi-directional coordination between virtual models and the physical construction. This will enable improvements in progress monitoring, construction process control, as-built documentation and sustainable building practices. To maintain bi-directional coordination, computational resources are required to tightly integrate the virtual models and the physical construction such that changes in one environment are automatically reflected in the other. This paper focuses on describing the role of bi-directional coordination in improving the construction project delivery process. A system architecture is presented, which illustrates the necessary technologies and sub-systems needed to facilitate the two way coordination. Future deployment scenarios are also presented to illustrate the potential benefits to the construction industry.",
author = "Abiola Akanmu and Chimay Anumba and John Messner",
year = "2013",
month = "6",
day = "1",
language = "English (US)",
volume = "18",
pages = "240--260",
journal = "Electronic Journal of Information Technology in Construction",
issn = "1400-6529",
publisher = "Kungliga Tenkniska Hoegskolan/Royal Institute of technology",

}

SCenarios for cyber-physical systems integration in construction. / Akanmu, Abiola; Anumba, Chimay; Messner, John.

In: Journal of Information Technology in Construction, Vol. 18, 01.06.2013, p. 240-260.

Research output: Contribution to journalArticle

TY - JOUR

T1 - SCenarios for cyber-physical systems integration in construction

AU - Akanmu, Abiola

AU - Anumba, Chimay

AU - Messner, John

PY - 2013/6/1

Y1 - 2013/6/1

N2 - There is an increasing growth in the use of virtual models in the construction industry but this use is often limited to the design and tendering/bidding stage. Much more benefit can be derived from these models by extending their use to the construction and operations and maintenance phases of a facility's lifecycle. A good way of achieving this involves real-time bi-directional coordination between virtual models and the physical construction. This will enable improvements in progress monitoring, construction process control, as-built documentation and sustainable building practices. To maintain bi-directional coordination, computational resources are required to tightly integrate the virtual models and the physical construction such that changes in one environment are automatically reflected in the other. This paper focuses on describing the role of bi-directional coordination in improving the construction project delivery process. A system architecture is presented, which illustrates the necessary technologies and sub-systems needed to facilitate the two way coordination. Future deployment scenarios are also presented to illustrate the potential benefits to the construction industry.

AB - There is an increasing growth in the use of virtual models in the construction industry but this use is often limited to the design and tendering/bidding stage. Much more benefit can be derived from these models by extending their use to the construction and operations and maintenance phases of a facility's lifecycle. A good way of achieving this involves real-time bi-directional coordination between virtual models and the physical construction. This will enable improvements in progress monitoring, construction process control, as-built documentation and sustainable building practices. To maintain bi-directional coordination, computational resources are required to tightly integrate the virtual models and the physical construction such that changes in one environment are automatically reflected in the other. This paper focuses on describing the role of bi-directional coordination in improving the construction project delivery process. A system architecture is presented, which illustrates the necessary technologies and sub-systems needed to facilitate the two way coordination. Future deployment scenarios are also presented to illustrate the potential benefits to the construction industry.

UR - http://www.scopus.com/inward/record.url?scp=84880055872&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=84880055872&partnerID=8YFLogxK

M3 - Article

AN - SCOPUS:84880055872

VL - 18

SP - 240

EP - 260

JO - Electronic Journal of Information Technology in Construction

JF - Electronic Journal of Information Technology in Construction

SN - 1400-6529

ER -