Sequence planning for electrical construction

Michael J. Horman, Matthew P. Orosz, David R. Riley

Research output: Contribution to journalArticle

13 Citations (Scopus)

Abstract

The sequences in which work is completed bear significantly on the performance of electrical contractors in building construction projects. When project work sequences are poorly planned or poorly executed, electrician constructors often must contend with compressed schedules, trade stacking, and out-of-sequence work to ensure timely completion of a project. This paper analytically evaluates the importance of sequence planning to efficient electrical work. It describes changes that were made to crew-level planning procedures for an electrical contractor and the impact these had on crew performance. The analysis shows that sequence planning at both the project level and the crew level are important to the performance of electrical crews. Most notably, a strong correlation (0.73) was detected between crew planning performance one week and crew productivity performance in the following week. Results of the study are provided. Principles of sound sequences and guidelines for sequence planning are also captured from the analysis. These sequence guidelines are designed to avoid, where possible, the often adverse project conditions in which electrical contractors find themselves and to handle those conditions most effectively when they cannot be avoided.

Original languageEnglish (US)
Pages (from-to)363-372
Number of pages10
JournalJournal of Construction Engineering and Management
Volume132
Issue number4
DOIs
StatePublished - Apr 1 2006

Fingerprint

Planning
Contractors
Productivity
Acoustic waves

All Science Journal Classification (ASJC) codes

  • Civil and Structural Engineering
  • Building and Construction
  • Industrial relations
  • Strategy and Management

Cite this

Horman, Michael J. ; Orosz, Matthew P. ; Riley, David R. / Sequence planning for electrical construction. In: Journal of Construction Engineering and Management. 2006 ; Vol. 132, No. 4. pp. 363-372.
@article{a81a951b6b1047b8922949f2aec9739b,
title = "Sequence planning for electrical construction",
abstract = "The sequences in which work is completed bear significantly on the performance of electrical contractors in building construction projects. When project work sequences are poorly planned or poorly executed, electrician constructors often must contend with compressed schedules, trade stacking, and out-of-sequence work to ensure timely completion of a project. This paper analytically evaluates the importance of sequence planning to efficient electrical work. It describes changes that were made to crew-level planning procedures for an electrical contractor and the impact these had on crew performance. The analysis shows that sequence planning at both the project level and the crew level are important to the performance of electrical crews. Most notably, a strong correlation (0.73) was detected between crew planning performance one week and crew productivity performance in the following week. Results of the study are provided. Principles of sound sequences and guidelines for sequence planning are also captured from the analysis. These sequence guidelines are designed to avoid, where possible, the often adverse project conditions in which electrical contractors find themselves and to handle those conditions most effectively when they cannot be avoided.",
author = "Horman, {Michael J.} and Orosz, {Matthew P.} and Riley, {David R.}",
year = "2006",
month = "4",
day = "1",
doi = "10.1061/(ASCE)0733-9364(2006)132:4(363)",
language = "English (US)",
volume = "132",
pages = "363--372",
journal = "Journal of Construction Engineering and Management - ASCE",
issn = "0733-9364",
publisher = "American Society of Civil Engineers (ASCE)",
number = "4",

}

Sequence planning for electrical construction. / Horman, Michael J.; Orosz, Matthew P.; Riley, David R.

In: Journal of Construction Engineering and Management, Vol. 132, No. 4, 01.04.2006, p. 363-372.

Research output: Contribution to journalArticle

TY - JOUR

T1 - Sequence planning for electrical construction

AU - Horman, Michael J.

AU - Orosz, Matthew P.

AU - Riley, David R.

PY - 2006/4/1

Y1 - 2006/4/1

N2 - The sequences in which work is completed bear significantly on the performance of electrical contractors in building construction projects. When project work sequences are poorly planned or poorly executed, electrician constructors often must contend with compressed schedules, trade stacking, and out-of-sequence work to ensure timely completion of a project. This paper analytically evaluates the importance of sequence planning to efficient electrical work. It describes changes that were made to crew-level planning procedures for an electrical contractor and the impact these had on crew performance. The analysis shows that sequence planning at both the project level and the crew level are important to the performance of electrical crews. Most notably, a strong correlation (0.73) was detected between crew planning performance one week and crew productivity performance in the following week. Results of the study are provided. Principles of sound sequences and guidelines for sequence planning are also captured from the analysis. These sequence guidelines are designed to avoid, where possible, the often adverse project conditions in which electrical contractors find themselves and to handle those conditions most effectively when they cannot be avoided.

AB - The sequences in which work is completed bear significantly on the performance of electrical contractors in building construction projects. When project work sequences are poorly planned or poorly executed, electrician constructors often must contend with compressed schedules, trade stacking, and out-of-sequence work to ensure timely completion of a project. This paper analytically evaluates the importance of sequence planning to efficient electrical work. It describes changes that were made to crew-level planning procedures for an electrical contractor and the impact these had on crew performance. The analysis shows that sequence planning at both the project level and the crew level are important to the performance of electrical crews. Most notably, a strong correlation (0.73) was detected between crew planning performance one week and crew productivity performance in the following week. Results of the study are provided. Principles of sound sequences and guidelines for sequence planning are also captured from the analysis. These sequence guidelines are designed to avoid, where possible, the often adverse project conditions in which electrical contractors find themselves and to handle those conditions most effectively when they cannot be avoided.

UR - http://www.scopus.com/inward/record.url?scp=33645149003&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=33645149003&partnerID=8YFLogxK

U2 - 10.1061/(ASCE)0733-9364(2006)132:4(363)

DO - 10.1061/(ASCE)0733-9364(2006)132:4(363)

M3 - Article

AN - SCOPUS:33645149003

VL - 132

SP - 363

EP - 372

JO - Journal of Construction Engineering and Management - ASCE

JF - Journal of Construction Engineering and Management - ASCE

SN - 0733-9364

IS - 4

ER -