TY - JOUR
T1 - The aperiodic facility layout problem with time-varying demands and an optimal master-slave solution approach
AU - Xiao, Yiyong
AU - Zhang, Yue
AU - Kulturel-Konak, Sadan
AU - Konak, Abdullah
AU - Xu, Yuchun
AU - Zhou, Shenghan
N1 - Funding Information:
This study was partly supported by the National Natural Science Foundation of China [grant numbers 71871003, 71571004, and 71971009].
Publisher Copyright:
© 2020 Informa UK Limited, trading as Taylor & Francis Group.
PY - 2021
Y1 - 2021
N2 - In many seasonal industries, customer demands are constantly changing over time, and accordingly the facility layout should be re-optimized in a timely manner to adapt to changing material handling patterns among manufacturing departments. This paper investigates the aperiodic facility layout problem (AFLP) that involves arranging facilities layout and re-layout aperiodically in a dynamic manufacturing environment during a given planning horizon. The AFLP is decomposed into a master problem and a combination set of static facility layout problems (FLPs, the slave problems) without loss of optimality, and all problems are formulated as mixed-integer linear programming (MILP) models that can be solved by MIP solvers for small-sized problems. An exact backward dynamic programming (BDP) algorithm with a computational complexity of O(n 2) is developed for the master problem, and an improved linear programming based problem evolution algorithm (PEA-LP) is developed for the traditional static FLP. Computational experiments are conducted on two new problems and twelve well-known benchmark problems from the literature, and the experimental results show that the proposed solution approach is promising for solving the AFLP with practical sizes of problem instances. In addition, the improved PEA-LP found new best solutions for five benchmark problems.
AB - In many seasonal industries, customer demands are constantly changing over time, and accordingly the facility layout should be re-optimized in a timely manner to adapt to changing material handling patterns among manufacturing departments. This paper investigates the aperiodic facility layout problem (AFLP) that involves arranging facilities layout and re-layout aperiodically in a dynamic manufacturing environment during a given planning horizon. The AFLP is decomposed into a master problem and a combination set of static facility layout problems (FLPs, the slave problems) without loss of optimality, and all problems are formulated as mixed-integer linear programming (MILP) models that can be solved by MIP solvers for small-sized problems. An exact backward dynamic programming (BDP) algorithm with a computational complexity of O(n 2) is developed for the master problem, and an improved linear programming based problem evolution algorithm (PEA-LP) is developed for the traditional static FLP. Computational experiments are conducted on two new problems and twelve well-known benchmark problems from the literature, and the experimental results show that the proposed solution approach is promising for solving the AFLP with practical sizes of problem instances. In addition, the improved PEA-LP found new best solutions for five benchmark problems.
UR - http://www.scopus.com/inward/record.url?scp=85087371132&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=85087371132&partnerID=8YFLogxK
U2 - 10.1080/00207543.2020.1775909
DO - 10.1080/00207543.2020.1775909
M3 - Article
AN - SCOPUS:85087371132
SN - 0020-7543
VL - 59
SP - 5216
EP - 5235
JO - International Journal of Production Research
JF - International Journal of Production Research
IS - 17
ER -