Valuing electricity transmission: The case of Alberta

Joseph Doucet, Andrew Nathan Kleit, Serkan Fikirdanis

Research output: Contribution to journalArticle

4 Citations (Scopus)

Abstract

Transmission economics remains a difficult area. Market forces alone are generally felt to be insufficient for signaling investment due to appropriability problems and the challenges of "parallel (loop) flow." Further, there is no generally recognized method of estimating the value of transmission expansion. Here we extend the approach of Kleit and Reitzes (2008) to the nearly isolated electricity grid of Alberta, essentially eliminating the problems of parallel flow. With this model, we are able to determine the value of electricity flows to and from Alberta, as well as the transactions costs associated with those flows. We are also able to value the impact of transmission expansion in Alberta. We apply this model to a project currently being developed, the Montana-Alberta Tie Line (MATL). Depending on the relevant elasticity of supply, we find that the MATL owners will be able to appropriate between 80% and 96% of the societal value of their new transmission capacity. This high level of appropriability is in contrast to the conclusions of most of the literature in this area, suggesting that market forces may in some instances be effective in providing incentives for optimal transmission investment.

Original languageEnglish (US)
Pages (from-to)396-404
Number of pages9
JournalEnergy Economics
Volume36
DOIs
StatePublished - Mar 1 2013

Fingerprint

Electricity
Parallel flow
Elasticity
Electricity transmission
Economics
Costs
Appropriability
Market forces

All Science Journal Classification (ASJC) codes

  • Economics and Econometrics
  • Energy(all)

Cite this

Doucet, Joseph ; Kleit, Andrew Nathan ; Fikirdanis, Serkan. / Valuing electricity transmission : The case of Alberta. In: Energy Economics. 2013 ; Vol. 36. pp. 396-404.
@article{930dbb670bfa466d908a4031777dd34f,
title = "Valuing electricity transmission: The case of Alberta",
abstract = "Transmission economics remains a difficult area. Market forces alone are generally felt to be insufficient for signaling investment due to appropriability problems and the challenges of {"}parallel (loop) flow.{"} Further, there is no generally recognized method of estimating the value of transmission expansion. Here we extend the approach of Kleit and Reitzes (2008) to the nearly isolated electricity grid of Alberta, essentially eliminating the problems of parallel flow. With this model, we are able to determine the value of electricity flows to and from Alberta, as well as the transactions costs associated with those flows. We are also able to value the impact of transmission expansion in Alberta. We apply this model to a project currently being developed, the Montana-Alberta Tie Line (MATL). Depending on the relevant elasticity of supply, we find that the MATL owners will be able to appropriate between 80{\%} and 96{\%} of the societal value of their new transmission capacity. This high level of appropriability is in contrast to the conclusions of most of the literature in this area, suggesting that market forces may in some instances be effective in providing incentives for optimal transmission investment.",
author = "Joseph Doucet and Kleit, {Andrew Nathan} and Serkan Fikirdanis",
year = "2013",
month = "3",
day = "1",
doi = "10.1016/j.eneco.2012.09.013",
language = "English (US)",
volume = "36",
pages = "396--404",
journal = "Energy Economics",
issn = "0140-9883",
publisher = "Elsevier",

}

Valuing electricity transmission : The case of Alberta. / Doucet, Joseph; Kleit, Andrew Nathan; Fikirdanis, Serkan.

In: Energy Economics, Vol. 36, 01.03.2013, p. 396-404.

Research output: Contribution to journalArticle

TY - JOUR

T1 - Valuing electricity transmission

T2 - The case of Alberta

AU - Doucet, Joseph

AU - Kleit, Andrew Nathan

AU - Fikirdanis, Serkan

PY - 2013/3/1

Y1 - 2013/3/1

N2 - Transmission economics remains a difficult area. Market forces alone are generally felt to be insufficient for signaling investment due to appropriability problems and the challenges of "parallel (loop) flow." Further, there is no generally recognized method of estimating the value of transmission expansion. Here we extend the approach of Kleit and Reitzes (2008) to the nearly isolated electricity grid of Alberta, essentially eliminating the problems of parallel flow. With this model, we are able to determine the value of electricity flows to and from Alberta, as well as the transactions costs associated with those flows. We are also able to value the impact of transmission expansion in Alberta. We apply this model to a project currently being developed, the Montana-Alberta Tie Line (MATL). Depending on the relevant elasticity of supply, we find that the MATL owners will be able to appropriate between 80% and 96% of the societal value of their new transmission capacity. This high level of appropriability is in contrast to the conclusions of most of the literature in this area, suggesting that market forces may in some instances be effective in providing incentives for optimal transmission investment.

AB - Transmission economics remains a difficult area. Market forces alone are generally felt to be insufficient for signaling investment due to appropriability problems and the challenges of "parallel (loop) flow." Further, there is no generally recognized method of estimating the value of transmission expansion. Here we extend the approach of Kleit and Reitzes (2008) to the nearly isolated electricity grid of Alberta, essentially eliminating the problems of parallel flow. With this model, we are able to determine the value of electricity flows to and from Alberta, as well as the transactions costs associated with those flows. We are also able to value the impact of transmission expansion in Alberta. We apply this model to a project currently being developed, the Montana-Alberta Tie Line (MATL). Depending on the relevant elasticity of supply, we find that the MATL owners will be able to appropriate between 80% and 96% of the societal value of their new transmission capacity. This high level of appropriability is in contrast to the conclusions of most of the literature in this area, suggesting that market forces may in some instances be effective in providing incentives for optimal transmission investment.

UR - http://www.scopus.com/inward/record.url?scp=84874334696&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=84874334696&partnerID=8YFLogxK

U2 - 10.1016/j.eneco.2012.09.013

DO - 10.1016/j.eneco.2012.09.013

M3 - Article

AN - SCOPUS:84874334696

VL - 36

SP - 396

EP - 404

JO - Energy Economics

JF - Energy Economics

SN - 0140-9883

ER -